Replacing Memory Modules; Preliminary Steps - Fujitsu PRIMERGY CX2560 M4 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX2560 M4:
Table of Contents

Advertisement

7.4

Replacing memory modules

Upgrade and Repair Unit
(URU)
Tools: tool-less
7.4.1

Preliminary steps

Perform the following procedures:
"Disabling the boot watchdog functionality of ServerView Operations
Ê
Manager" on page 73
Ê Locate the desired server node with the ID button.
"Shutting down the server node" on page 50
Ê
Ê If applicable, remove all external cables from the server node.
"Removing the server node from the server enclosure" on page 51
Ê
"Removing the memory slot air duct (Air cooling only)" on page 63
Ê
CX2550/60/70 M4
Upgrade and Maintenance Manual
Main memory
Hardware: 5 minutes
197

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy cx2550 m4Primergy cx2570 m4

Table of Contents