System board and components
9.3.3.1
Preliminary steps
"Disabling the boot watchdog functionality of ServerView Operations
Ê
Manager" on page 73
"Suspending BitLocker functionality" on page 71
Ê
Ê Locate the desired server with the ID button.
"Shutting down the server node" on page 50
Ê
Ê If applicable, remove all external cables from the server node.
"Removing the server node from the server enclosure" on page 51
Ê
9.3.3.2
Removing the defective TPM
Ê Remove the TPM, see section
Ê Leave the TPM spacer on the system board when removing the defective
TPM.
9.3.3.3
Installing the new TPM
I
The TPM spacer is already present on the system board.
Ê Install the TPM, see section
9.3.3.4
Concluding steps
"Installing the system board" on page 311
Ê
"Completing the system board" on page 317
Ê
"Installing the server node in the server enclosure" on page 67
Ê
Ê If applicable, reconnect all external cables.
"Resuming BitLocker functionality" on page 96
Ê
"Enabling SVOM boot watchdog functionality" on page 88
Ê
290
"Removing the TPM" on page
"Installing the TPM" on page
Upgrade and Maintenance Manual
285.
282.
CX2550/60/70 M4