Concluding Steps - Fujitsu PRIMERGY CX2560 M4 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX2560 M4:
Table of Contents

Advertisement

7.2.3

Concluding steps

Perform the following procedures:
"Installing the memory slot air duct (Air cooling only)" on page 64
Ê
Ê Identify the correct memory slot according to the mounting order, see section
"Memory sequence" on page
"Installing the server node in the server enclosure" on page 67
Ê
Ê If applicable, reconnect all external cables.
"Controls and indicators on the server node" on page 448
Ê
"Updating or recovering the system board BIOS and iRMC" on page 77
Ê
applicable)
"Verifying the memory mode" on page 90
Ê
"Resetting the error status after replacing CPUs" on page 103
Ê
CX2550/60/70 M4
185.
Upgrade and Maintenance Manual
(if applicable)
Main memory
(if
193

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy cx2550 m4Primergy cx2570 m4

Table of Contents