Replacing The Fbu; Preliminary Steps - Fujitsu PRIMERGY CX2560 M4 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX2560 M4:
Table of Contents

Advertisement

Expansion cards and OCP mezzanine cards
6.4.4

Replacing the FBU

Upgrade and Repair Unit
(URU)
Tools: tool-less
V
CAUTION!
Do not throw battery backup units into the trash can. Batteries must be
disposed of in accordance with local regulations concerning special
waste.
For further safety information, see section
page
44.
6.4.4.1

Preliminary steps

"Disabling the boot watchdog functionality of ServerView Operations
Ê
Manager" on page 73
Ê Locate the desired server node with the ID button.
"Shutting down the server node" on page 50
Ê
Ê Remove all external cables from the server node.
"Removing the server node from the server enclosure" on page 51
Ê
"Removing the memory slot air duct (Air cooling only)" on page 63
Ê
Ê Remove the riser module next to that one with the RAID card, see section
"Removing the riser module" on page
152
Upgrade and Maintenance Manual
Hardware: 10 minutes
"Environmental protection" on
58.
CX2550/60/70 M4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy cx2550 m4Primergy cx2570 m4

Table of Contents