Reduced Acceptance Test After Component Replacement - Siemens SINAMICS G120D Operating Instructions Manual

Control units, distrubuted converter
Hide thumbs Also See for SINAMICS G120D:
Table of Contents

Advertisement

Corrective maintenance

10.12 Reduced acceptance test after component replacement

10.12
Reduced acceptance test after component replacement
After a component has been replaced or the firmware updated, a reduced acceptance test of
the safety functions must be performed.
Measure
Replacing the Control Unit.
Replacing the Power Module.
Replace the motor with an
identical pole pair number
Replace the gearbox with an
identical ratio
Replacing safety-related
peripherals (e.g. Emergency Stop
switch).
Inverter firmware update.
230
Acceptance test
Acceptance test
No.
Only check the
direction of rotation of
the motor.
No.
Only check the control
of the safety functions
that are influenced by
the components that
have been replaced.
No.
Operating Instructions, 04/2014, FW V4.7, A5E34262100B AA
Documentation
Supplement inverter data
Log the new checksums
Countersignature
Supplement the hardware version in
the inverter data
No change.
No change.
Supplement firmware version in the
inverter data
Log the new checksums
Countersignature.
Converter with control units CU240D-2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu240d-2

Table of Contents