Maintenance Instructions
15.1 Maintenance Instructions HAAKE RheoStress1
The system check on the HAAKE RheoStress1 must
be carried out once yearly.
1.
Check the lifting device with drive and guideway
cover. *
2.
Clean and lubricate screw.*
3.
Check safety device and final cut--off lift.*
4.
Check air--cushion bearing monitoring function.*
5.
Test and adjust surface plate and plate carrier
mechanically.*
6.
Update devices to newest operating software.
7.
Test measurement with test liquid in CS/CR mode.
8.
General function test.*
9.
Check all sensors for smooth running and damage.
10. Check temperature stabiliser (if applicable):*
Liquid tempering:
Check hose connections, sensors, update operatin
software.
TCE/P electric tempering:
Check heating elements, sensors, tempering.
TCP/P and TCP/PE Peltier tempering:
Check tempering, safety circuit, tempering.
* Check by official Thermo Fisher Scientific service.
Points 7 and 9 are recommended every 3 months.
139