Engineering and remote access
3.3 SIMATIC STEP 7 in the TIA Portal
Procedure
1. In the "Project tree", right-click on the SITOP UPS1600 controller.
The shortcut menu opens.
2. In the shortcut menu, in submenu "Download to device", select option "Hardware
configuration".
The project data are compiled. The "Load" button is activated as soon as loading is
possible.
3. Click on "Load".
Data is loaded. The "Result of the load operation" dialog window is then opened. In this
dialog, you can check whether the load task was successful and select any further
actions.
4. Click on the "Finish" button.
Result
The set parameters have been loaded to the SITOP UPS1600 via the controller.
66
SITOP UPS1600 / UPS1100
Manual, 04.2017, A5E37775406-8-76