Test Voltage - Siemens SITOP UPS1600 Manual

Hide thumbs Also See for SITOP UPS1600:
Table of Contents

Advertisement

Safety, approvals, EMC

9.2 Test voltage

9.2
Test voltage
Figure 9-1
Only applicable for UPS1600 with PROFINET (-2AY0).
Only the manufacturer can perform the type test and production test; users can also perform
the field test.
Preconditions for performing the field test:
Test (A)
● Connect the input, output, BAT and signaling contact with one another and measure with
respect to PE
Test (B)
● Connect all PROFINET cables and measure with respect to PE (input, output, BAT signal
connector and PE are connected with each other)
Table 9- 1
Test voltage
Type test
Production test
Field test
Remark:
Tripping current for DC measurement: 0 mA
Tripping current for AC measurement: <100 mA
222
Test voltage diagram
Test time
Input, output, BAT ↔ PE (A)
60 s
700 VDC
60 s
500 VAC
1 s
200 VDC
1 s
140 VAC
1 s
200 VDC
1 s
140 VAC
PROFINET ↔ PE (B)
2200 VDC
1500 VAC
2200 VDC
1500 VAC
SITOP UPS1600 / UPS1100
Manual, 04.2017, A5E37775406-8-76