Iiib) Procedure - kruss DSA100 Installation And Operation Manual

Drop shape analyzer
Table of Contents

Advertisement

Appendix
IIIb)
Procedure
1. Open both doors of the chambers on both sides of the DSA100. If necessary,
remove the liquid containers and their racks from the chambers.
2. In both chambers, a hexagon socket screw is situated behind the stand. Screw
out the screws in both chambers.
3. Remove the cover that was fixed with the screws.
4. Unscrew the middle cover. It is fixed with two hexagon socket screws on the
rear side and two screws on the inside.
page 93

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents