7. Disconnect the fuel injector wiring connectors; then
remove the intake manifolds leaving the injectors
installed.
8. Disconnect the stator coil connector and the crankshaft
position sensor connector; then disconnect the gear posi-
tion switch connector.
38
GZ090B
9. Loosen the clamps securing the V-belt cooling ducts
to the V-belt housing; then disconnect the cooling
ducts.
GZ106
GZ107
10. Remove the E-clips securing the shift linkage to the
shift lever and shift shaft; then remove the shift link-
age. Account for two bushings and two flat washers.
11. Remove the cap screws securing the rear driveshaft
yoke flange to the rear output flange.
GZ069A
GZ368A
GZ037
GZ103B