Led Indications - LEGRAND Mosaic Manageable switch Installation And Configuration Manual

Gigabit poe
Table of Contents

Advertisement

Manageable Mosaic switch Installation and User Guide
Front Panel
(2) The two RJ45 built-in LEDs, part of Uplink 1 RJ45 connector,
are not active in the manageable Mosaic switch

1.4.1 LED Indications

Table 1-2 lists the LED indicators and their description.
Table 1-2 manageable Mosaic switch LED Descriptions
LED Indicators
Power
Network Management
System (NMS)
Uplink 1-2 L/A (Link
Activity)
PoE Ports 1-4
Ports 1-4
Figure 1-3 manageable Mosaic switch Side view
Description
ON
– Main Power connected and power supply OK
OFF
– Management startup/inoperable
ON
– Management up and active
OFF
– no link
ON
– link established on uplink port(s)
BLINKING
– activity detected (TX and / or RX) on the port(s)
OFF
– PoE / PSE disabled on the port
BLINKING
– PoE / PSE enabled, but PoE power not provided to
ON
– PD detected, PoE / PSE power (52VDC) provided to
OFF
– no link
ON
– link established
BLINKING
– activity detected (TX and / or RX) on the port(s)
SUMMARY
the port (PD device not detected on the port)
the port
Cooling Plate
Uplink 1 RJ 45 ethernet port
Uplink 1 RJ45 Port
(2)
Shield Terminal
Uplink 2 SFP Port
Main DC Power Connector
Page 11 of 87

Advertisement

Table of Contents
loading

This manual is also suitable for:

Area box distribution switch

Table of Contents