SciCan STATIM 2000 Service Manual page 274

Hide thumbs Also See for STATIM 2000:
Table of Contents

Advertisement

13. Installation
3. TESTING THE UNIT
Power up unit and run as follows:
Check cycle selection on all cycles.
Assemble test helix and integrator as per helix instructions. (S units only).
Remove cassette and place assembled helix on instrument rack.
Insert cassette and run a Hollow Wrapped Cycle (S units)/ Wrapped cycle (non S units).
Check for steam leaks
At end of cycle, (no drying) remove cassette and remove helix.
Check integrator for pass/fail (
Run 2nd Hollow Wrapped/Wrapped cycle
If the integrator shows a fail, do not use the unit. Replace unit and call SciCan representative.
Page 272
= pass
= fail)* (S units only)
STAT IM 2000/2000S
STATIM 2000/2000S/2000 G4 Service Guide
96-108639 Rev 3.0
Service Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Statim 2000sStatim 2000 g4

Table of Contents