Installation
August 2017
9. Remove the first support tool and lower the probe into the tank.
10. Repeat steps
probe.
11. Seal and protect threads.
48
PRELIMINARY
5
to
9
until all segments are mounted. Make sure to finish with the top segment of the
Only for NPT threaded tank connection.
Use anti-seize paste or PTFE tape
according to your site procedures.
Reference Manual
00809-0100-4308, Rev CA
Installation