Reference Manual
00809-0100-4308, Rev CA
5. Mount the transmitter head.
6. Continue with the grounding step.
3.6.4
Tank connection with Tri Clamp
1. Place a gasket on top of the tank flange.
2. Lower the transmitter and probe into the tank.
3. Fasten the Tri Clamp to the tank with a clamp.
Installation
PRELIMINARY
Torque 30 Lbft (40 Nm)
60 mm
Gasket
Installation
August 2017
41