Launching Injection Commissioning Tool (Ict) - ABB REG670 Commissioning Manual

Generator protection, relion 670 series
Hide thumbs Also See for REG670:
Table of Contents

Advertisement

1MRK 502 073-UEN A
6.3
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
Commissioning manual
Calibrating injection based sensitive rotor earth fault protection
After the three measurements ICT calculates the complex factors k1 and k2. The
reference impedance RefR1 + jRefX1 is also calculated. After this the values are
downloaded to the parameter setting in PCM600. From PCM600 the settings are
downloaded to IED.
During the three measurements described above a check is made that there are
sufficient changes in the measured impedance in order to guarantee that there is no
primary fault from the beginning or other problems due to the installation or
calibration procedure.
Now the reference impedance is derived for one operational state. It might be
necessary to make measurements to derive reference impedance for other
operational cases. For information on this, see Commissioning below.
Commissioning
Different operating conditions of the machine may require different reference
impedances.
If a particular operating condition of the generator requires a second reference
impedance, the Commissioning tab of ICT is used to define and save the second
reference.
If more than one reference impedance are to be used, there must be a logic
configured to detect when the generator is in such condition and change the
reference.
Monitoring
The Monitoring tab of ICT offers the possibility to monitor several quantities
during tests as well as in normal operating condition in order to evaluate the
behavior of the protection function. It can help in the identification of the operating
conditions, where a change of reference impedance is required.
Auditing
In the auditing part calibration and commissioning reports are stored.
.

Launching injection commissioning tool (ICT)

1.
To launch the Injection commissioning tool (ICT), right-click REG670 in the
PCM plant structure and select the Injection commissioning.
2.
In the ICT toolbar, select the Rotor Earth Fault function.
Section 6
GUID-15CAE2A3-FA17-4119-9188-824C7F309D4B v2
61

Advertisement

Table of Contents
loading

Table of Contents