Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
Commissioning manual
To ensure that the IED is according to the delivery and ordering specifications
documents delivered together with each IED, the user should also after start-up use
the built in HMI to check the IED's:
Software version, Main menu/Diagnostics/IED status/Product identifiers.
Serial number, Main menu/Diagnostics/IED status/Product identifiers.
Installed modules and their ordering number, Main menu/Diagnostics/IED
status/Installed HW.

IED start-up sequence

When the IED is energized, the green LED starts flashing instantly. After
approximately 55 seconds the window lights up and the window displays 'IED
Startup'. The main menu is displayed and the upper row should indicate 'Ready'
after about 90 seconds. A steady green light indicates a successful startup.
1
2
0
t1
IEC04000310 V2 EN-US
Figure 2:
Typical IED start-up sequence
1 IED energized. Green LED instantly starts flashing
2 LCD lights up and "IED startup" is displayed
3 The main menu is displayed. A steady green light indicates a successful startup.
If the upper row in the window indicates 'Fail' instead of 'Ready' and the green
LED flashes, an internal failure in the IED has been detected.

Energizing REX060

REX060 start up sequence

When the injection unit REX060 is energized, the ABB logotype is shown
followed by current REX060 revision status. When the start up sequence is
completed, the main menu (normal display content) is shown. The duration of the
start up sequence is a few seconds.
3
t (s)
t2
xx04000310-1-en.vsd
Section 4
Starting up
M11727-3 v12
GUID-63A15CD3-17B0-41DD-9611-8272DDA53137 v1
45