Section 13
Testing functionality by secondary injection
13.3.3.2
13.3.4
13.3.4.1
134
inputs as the generator differential protection, are set off. Make sure that the
generator differential function is unblocked.
2.
Connect the test set for injection of three-phase current to the current IEDs,
which are connected to the CTs on the HV side of the generator.
3.
Increase the current in phase L1 until the protection function operates and
note the operating current.
4.
Check that trip and alarm contacts operate according to the configuration
logic.
5.
Decrease the current slowly from operate value and note the reset value.
6.
Check in the same way the function by injecting current in phases L2 and L3.
7.
Inject a symmetrical three-phase current and note the operate value.
8.
Connect the timer and set the current to twice the operate value.
9.
Switch on the current and note the operate time.
10. Check in the same way the functioning of the measuring circuits connected to
the CTs on the neutral point side of the generator.
11. Finally check that trip information is stored in the event menu.
Information on how to use the event menu is found in the
operator's manual.
12. If available on the test set a second-harmonic current of about 20% (assumes
15% setting on I1/I2 ratio parameter) can be added to the fundamental tone in
phase L1. Increase the current in phase L1 above the start value measured in
step 3. Repeat test with current injection in phases L2 and L3 respectively.
Fifth-harmonic blocking can be tested in a similar way.
The balancing of currents flowing into and out of the differential zone is
typically checked by primary testing.

Completing the test

Continue to test another function or end the test by changing the TESTMODE
setting to Off. Restore connections and settings to their original values, if they were
changed for testing purposes.

Restricted earth fault protection, low impedance REFPDIF

Prepare the IED for verification of settings outlined in Section
to verify
settings".

Verifying the settings

Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
1MRK 502 073-UEN A
SEMOD155702-82 v3
SEMOD55252-82 v8
"Preparing the IED
SEMOD55252-86 v11
Commissioning manual

Advertisement

Table of Contents
loading

Table of Contents