Establishing connection and verifying the IEEE C37.118/1344 communication
112
IEC140000143 V1 EN-US
Figure 35:
Stop capturing the IEEE C37.118 synchrophasor data
Open the capture file and observe the captured synchrophasor data. In order to
get the Phasor names on top of each column (See figure 36), the capture
process should start before connecting the PMU Connection Tester to the
PMU, i.e. first start the capturing and then click Connect.