Completing The Test - ABB REG670 Commissioning Manual

Generator protection, relion 670 series
Hide thumbs Also See for REG670:
Table of Contents

Advertisement

Section 13
Testing functionality by secondary injection
13.10.1.5
238
SESRSYN
CBConfig
setting
SESRSYN 2
Tie CB
(Operates on
TIE_QA1)
SESRSYN 3
1 ½ bus
(Operates on
alt. CB
WA2_QA1)
(mirrored)
WA1_QA1
(SESRSYN 1)
(SESRSYN 2)
LINE1_QB9
LINE1
IEC11000274 V3 EN-US
Figure 65:
Objects used in the voltage selection logic

Completing the test

Continue to test another function or end the test by changing the TESTMODE
setting to Off. Restore connections and settings to their original values, if they were
changed for testing purposes.
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
Section to
Activated
Activated
be
B1QCLD
B2QCLD
synchroniz
input on
input on
ed
IED from
IED from
LINE1 –
LINE2
WA1 –
WA1_QA
LINE2
1
WA2 –
WA2_QA
LINE1
1
WA1 –
WA1_QA
WA2_QA
WA2
1
1
WA2 –
LINE2
WA2 –
TIE_QA1
LINE1
WA2 –
TIE_QA1
WA1_QA
WA1
1
WA1
WA2
WA2_QA1
(SESRSYN 3)
TIE_QA1
LINE2_QB9
LINE2
IEC11000274-3-en.vsd
1MRK 502 073-UEN A
Activated
Activated
Indication
LN1QCLD
LN2QCLD
from
input on
input on
SESRSYN
IED from
IED from
on IED
LINE1_Q
LINE2_Q
LN1SEL,
B9
B9
LN2SEL
LINE2_Q
B1SEL,
B9
LN2SEL
LINE1_Q
B2SEL,
B9
LN1SEL
B1SEL,
B2SEL
LINE2_Q
B2SEL,
B9
LN2SEL
LINE1_Q
B2SEL,
B9
LN1SEL
B1SEL,
B2SEL
M2377-1042 v5
Commissioning manual