Auditing - ABB REG670 Commissioning Manual

Generator protection, relion 670 series
Hide thumbs Also See for REG670:
Table of Contents

Advertisement

Section 6
Calibrating injection based sensitive rotor earth fault protection
6.7
70
After completion of the calibration step
Before leaving the ICT Tool

Auditing

During installations, calibrations and commissions the ICT generates reports for
each of the steps and collects them under the Auditing tab. See the procedures
below on how to view and delete reports as well as generate logs from reports.
1.
To view the reports, go to the Auditing tab.
GUID-8348F60B-9BF5-4018-9740-0FA3371B0F9F V1 EN-US
Figure 15:
Auditing tab
2.
Open and view each report.
3.
View reports in one of the following ways:
In the short cut menu, right click and select View report.
Click the View report button in the upper right corner of the auditing
screen.
Double click a report record.
4.
Delete reports in one of the following ways:
In the short cut menu, right click and select Delete report.
Click the Delete report button in the upper right corner of the auditing
screen.
Select a record with the mouse cursor then press the Delete key on the
keyboard.
5.
Generate logs in one of the following ways:
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
1MRK 502 073-UEN A
GUID-70137BAD-6BD5-4835-964E-B6ADAE522A15 v1
IEC11000049-1-en.vsd
Commissioning manual