ABB REG670 Commissioning Manual page 215

Generator protection, relion 670 series
Hide thumbs Also See for REG670:
Table of Contents

Advertisement

1MRK 502 073-UEN A
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
Commissioning manual
Testing functionality by secondary injection
UL1
UL2
UL3
UN
IEC07000106 V2 EN-US
Figure 58:
Connection of the test set to the IED for test of U1 block level
where:
1
is three-phase voltage group1 (U1)
2
is three-phase voltage group2 (U2)
3.
Decrease slowly the voltage in phase UL1 of the test set until the START
signal resets.
4.
Check U1 blocking level by comparing the voltage level at reset with the set
undervoltage blocking U1Low.
5.
Repeat steps
2
to
4
The connections to U1 must be shifted to test another phase.
(UL1 to UL2, UL2 to UL3, UL3 to UL1)
Check of U2Low
Procedure
1.
Connect voltages to the IED according to valid connection diagram and
figure 59.
to check U1Low for the other phases.
Section 13
UL1
UL2
1
UL3
UN
UL1
2
UL2
UL3
IEC07000106-1-en.vsd
SEMOD175258-91 v3
209

Advertisement

Table of Contents
loading

Table of Contents