Section 13
Testing functionality by secondary injection
230
Prepare the IED for verification of settings outlined in Section
to verify
settings".
At commissioning and periodical checks, the functions shall be tested with the used
settings. To test a specific function, it might be necessary to change some setting
parameters, for example:
AutoEnerg = Off/DLLB/DBLL/Both
ManEnerg = Off
Operation = Off/On
Activation of the voltage selection function if applicable
The tests explained in the test procedures below describe the settings, which can be
used as references during testing before the final settings are specified. After
testing, restore the equipment to the normal or desired settings.
A secondary injection test set with the possibility to alter the phase angle and
amplitude of the voltage is needed. The test set must also be able to generate
different frequencies on different outputs.
The description below applies for a system with a nominal
frequency of 50 Hz but can be directly applicable to 60 Hz.
SESRSYN can be set to use different phases, phase to earth or
phase to phase. Use the set voltages instead of what is indicated
below.
Figure
62
shows the general test connection principle, which can be used during
testing. This description describes the test of the version intended for one bay.
Figure
63
shows the general test connection for a 1½ breaker diameter with one-
phase voltage connected to the line side.
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
1MRK 502 073-UEN A