Section 7
Calibrating injection based 100% stator earth fault protection
7.7
86
Trip indication shall be visible in the ICT toolbar.
11. Verify that TRIP and ALARM signals are connected to tripping/alarming/
signaling/communication in accordance with the scheme design.
It is very important that the Function Tripping is Enabled under the
following situations:
After completion of the calibration step
Before leaving the ICT Tool

Auditing

During installations, calibrations and commissions the ICT generates reports for
each of the steps and collects them under the Auditing tab. See the procedures
below on how to view and delete reports as well as generate logs from reports.
1.
To view the reports, go to the Auditing tab.
GUID-8348F60B-9BF5-4018-9740-0FA3371B0F9F V1 EN-US
Figure 25:
Auditing tab
2.
Open and view each report.
3.
View reports in one of the following ways:
In the short cut menu, right click and select View report.
Click the View report button in the upper right corner of the auditing
screen.
Double click a report record.
4.
Delete reports in one of the following ways:
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
1MRK 502 073-UEN A
GUID-70137BAD-6BD5-4835-964E-B6ADAE522A15 v1
IEC11000049-1-en.vsd
Commissioning manual