Section 13
Testing functionality by secondary injection
182
5.
Measure the operate time of the timer by injecting a current two times the set
INcosPhi> value and the polarizing voltage 1.2 · UNRel>.
×
kSN Sref
=
Tinv
×
3
I
3
U
0
test
0
IECEQUATION2402 V2 EN-US
6.
Compare the result with the expected value.
The expected value depends on whether definite or inverse time was selected.
7.
Set the polarizing voltage to zero and increase until the boolean output signal
UNREL is activated, which is visible in the Application Configuration in
PCM600 when the IED is in online mode. Compare the voltage with the set
value UNRel> .
8.
Continue to test another function or complete the test by setting the test mode
to Off.
IEC06000650 V2 EN-US
Figure 55:
Characteristic with ROADir restriction
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
( )
×
j
cos
test
3I
0
j
3 ×
j
I
cos
0
ROADir
1MRK 502 073-UEN A
o
=
RCADir
0
Operate area
-
=
3
U
U
0
ref
IEC06000650_2_en.vsd
Commissioning manual
(Equation 77)