1MRK 502 035-UEN A
7.5.8.2

Completing the test

Continue to test another function or end the testing by setting the parameter
under Main menu/Tests/IED test mode/1:TESTMODE. If another function is tested, then set
the parameter
GOPPDOP(32,P>)/X:GOPPDOP for the function, or for each individual function in a chain, to be
tested next. Remember to set the parameter
has been tested.
7.5.9
Accidental energizing protection for synchronous generator
AEGGAPC
Prepare the IED for verification of settings as outlined in
settings".
Values of the logical signals for AEGGAPC are available on the local HMI under Main menu/
Tests/Function status/Current/AEGGAPC(50AE,U<&I>)/1:AEGGAPC. The Signal Monitoring
in PCM600 shows the same signals that are available on the local HMI.
7.5.9.1

Verifying the settings

1.
Connect the test set for three-phase current injection and for three phase voltage
injection to the appropriate IED terminals.
2.
Inject zero voltage to the IED.
3.
Increase the injected symmetric three phase current slowly and note the operated value
(start value).
4.
Decrease the current slowly and note the reset value.
5.
Connect a trip output contact to a timer.
6.
Set the injected current to 200% of the operate level, switch on the current and check the
time delay.
7.
Check that all trip and start contacts operate according to the configuration (signal
matrises).
8.
Finally check that start and trip information is stored in the event menu.
9.
Inject rated symmetric three phase voltage to the IED.
10.
Set the injected current to 200% of the operate level, switch on the current. The function
shall not start and trip.
11.
Inject 95% of the set
12.
Set the injected current to 200% of the operate level, switch on the current. The function
shall start and trip.
7.5.10
Negative-sequence time overcurrent protection for machines
NS2PTOC
Prepare the IED for verification of settings as outlined in
settings".
Values of the logical signals for NS2PTOC are available on the local HMI under Main menu/
Tests/Function status/Current/NS2PTOC(46I2,2I2>)/1:NS2PTOC. The Signal Monitoring in
PCM600 shows the same signals that are available on the local HMI.
7.5.10.1

Verifying settings by secondary injection

Generator protection REG650
Commissioning manual
Blocked to No under Main menu/Tests/Function test modes/Current/
ArmU< value symmetric three-phase voltage to the IED.
© Copyright 2011 ABB. All rights reserved
Blocked to Yes , for each individual function that
6.1"Preparing the IED to verify
6.1"Preparing the IED to verify
Section 7
Testing functionality
SEMOD175058-66 v4
TestMode to Off
GUID-6E141754-28E5-408D-955F-899720BA59E0 v1
GUID-B834BA0F-E8CE-4B08-9FCE-B6D2813D3197 v2
GUID-48A6DA1D-5CF5-4C1B-B1A4-3F2C73851FD4 v2
GUID-EB788169-532A-4A3E-BBEC-DCB28169DF86 v2
63