ABB REG670 Commissioning Manual page 132

Generator protection, relion 670 series
Hide thumbs Also See for REG670:
Table of Contents

Advertisement

Section 12
Testing IED operation
126
IEC15000023 V1 EN-US
4.
Click Start editing signal value for forcing on the tool bar.
IEC15000024 V1 EN-US
The Signal Monitoring menu changes and indicates the forcing values that
can be edited.
IEC15000025 V1 EN-US
5.
Select and edit the values.
6.
Click Acknowledge and send.
IEC15000026 V1 EN-US
This commits the values to the IED and exits the editing session.
7.
Click Cancel to abort the changes and revert back to actual IED values.
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
1MRK 502 073-UEN A
Commissioning manual