Yamaha STAR XVS95CE 2DX1 2014 Service Manual page 85

Xvs95ce(c)
Table of Contents

Advertisement

1. Stator coil lead
2. Neutral switch lead
3. Oil level switch lead
4. Wire harness
5. Tail sub-wire harness
6. Headlight relay
7. Starter relay
8. Fuse box
9. Main fuse lead
10. Positive battery lead
11. Sidestand switch coupler
12. Crankshaft position sensor lead
13. Turn signal relay
14. Relay unit
15. Lean angle sensor lead
16. Starter motor lead
17. Main fuse
18. Yamaha diagnostic tool coupler
19. Speed sensor lead
20. Ground lead
A. After connecting the couplers, cover the couplers
with the coupler cover, and then place the couplers
in the air duct.
B. Insert the projections on the wire harness holders
into the holes in the frame.
C. Do not face the catch of the holder downward.
D. Insert the projection on the tail sub-wire harness
holder into the hole in the battery box.
E. Insert the projection on the wire harness holder
into the hole in the battery box.
F. Route the main fuse lead under the fuse box.
G. Route the positive battery lead under the fuse box.
H. To the starter motor
I.
Route the oil level switch lead to the inside of the
frame.
J. Route the sidestand switch lead to the inside of the
frame.
K. After connecting the sidestand switch coupler,
insert the projection on the coupler cover into the
hole in the frame.
L. Fasten the oil level switch lead and sidestand
switch lead with the holder. Position the holder
between the sidestand switch coupler and the
sidestand switch lead holder.
M. Install the sidestand switch lead holder at the
location shown.
N. Fasten the oil level switch lead to the frame with a
plastic locking tie.
O. Point the end of the plastic locking tie downward.
P. Insert the projection on the wire harness holder
into the hole in the battery box.
Q. Insert the projection on the positive battery lead
holder into the hole in the battery box.
R. After connecting the positive battery lead and
starter motor lead, install the starter relay cover.
S. Insert the projection on the ground lead holder into
the hole in the battery box.
T. Point the end of the plastic locking tie inward.
U. Position the buckle of the plastic locking tie on top
of the frame, with the end pointing outward, and
then cut off the excess end of the tie to 1
(0.04
0.20 in).
V. Install the ground lead terminal so that the crimped
section of the terminal that secures the lead is
facing inward. Install the ground lead terminal and
the drive pulley housing using the same bolt.
W. Side of the drive pulley housing
X. Install the ground lead terminal so that the
indicated section of the terminal is positioned to
the front of the side of the drive pulley housing.
5 mm
2-58
CABLE ROUTING

Advertisement

Table of Contents
loading

Table of Contents