Installation Of Zr20H Automatic Calibration Unit - YOKOGAWA ZR402G User Manual

Integrated type zirconia oxygen/humidity
Hide thumbs Also See for ZR402G:
Table of Contents

Advertisement

<Wall Mounting>
(1) Make a hole in the wall as illustrated in Figure 3.8.
140
F3.13E.ai
Figure 3.8
(2) Mount the flow setting unit. Remove the pipe mounting parts from the mount fittings of the
flow setting unit and attach the unit securely on the wall with four screws.
F3.14E.ai
Figure 3.9
3.3
Installation of ZR20H Automatic Calibration
Unit
The following should be taken into consideration:
(1) Easy access to the unit for checking and maintenance work.
(2) Near to the detector and the converter
(3) No corrosive gas.
(4) An ambient temperature of not more than 55°C and little change of temperature.
(5) No vibration.
(6) Little exposure to rays of the sun or rain.
Mounting of ZR20H Automatic Calibration Unit
n
ZR202G -  -  -  -  - A or B is shipped with automatic calibration unit attached.
The automatic calibration unit includes flowmeters and solenoid valves, so as to ensure reliable
and accurate operation – Flowmeter should be mounted vertically. The associated probe is
designed for horizontal or vertical mounting.
If you buy the automatic calibration unit afterward, and need to install it or replace it, contact our
service representative.
Unit: mm
223
4 - Ø6 hole, or M5 screw
Mounting holes
Wall mounting
<3. Installation>
IM 11M12A01-04E
11th Edition : Jul. 19, 2017-00
3-6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zr22aZr202gExaxt zr seriesZr202aZr22g

Table of Contents