Definition Of Equipment Status - YOKOGAWA ZR402G User Manual

Integrated type zirconia oxygen/humidity
Hide thumbs Also See for ZR402G:
Table of Contents

Advertisement

8.2.1

Definition of Equipment Status

(1) During warm-up
"During warm-up" is the time required after applying power until the sensor temperature
stabilizes at 750°C, and the equipment is in the measurement mode. This status is that the
sensor temperature is displayed on the basic panel.
(2) During maintenance
"During maintenance" is the time from when a valid password is entered in the basic panel
display to enable the parameter code selection display until the display goes back to the
basic panel display
(3) During calibration (see Chapter 9, Calibration)
In the manual calibration, proceed with the calibration operation with the parameter code
「B10」 to display the span gas confirmation display for the first span calibration, thus
starting the calibration time when the [ENT] key is touched. After a series of calibrations is
complete and the preset output stabilization time has elapsed, the calibration time will be up.
Figure 8.1 shows the definition of "during calibration" in the manual calibration.
Switch operation
>
>
>
>
>
>
>
>
>
>
>
>
>
>
Figure 8.1
Display
b10
ENT
CAL
ENT
CAL
ENT
SPAn
Y
ENT
21.00
ENT
%
OPEn/20.84
ENT
20.84
ENT
%
ZEro
Y
ENT
0.98
ENT
%
OPEn/0.89
ENT
0.89
ENT
%
CALEnd
ENT
b10
ENT
ENT
Measured-value
display
Definition of During Calibration
<8. Detailed Data Setting>
Output hold time
during calibration
IM 11M12A01-04E
8-6
11th Edition : Jul. 19, 2017-00

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zr22aZr202gExaxt zr seriesZr202aZr22g

Table of Contents