Yamaha FZ09E 2014 Service Manual page 299

Table of Contents

Advertisement

• Align the opening between the ends "b" of the
circlip with a groove "c" in the axle.
• Install the circlip so that a spline "d" is in the
center of the gap between the circlip ends "e"
as shown.
A. Main axle
B. Drive axle
2. Install:
• Toothed lock washer retainer "1"
• Toothed lock washer "2"
TIP
• With the toothed lock washer retainer in the
groove "a" in the axle, align the projection on
the retainer with an axle spline, and then install
the toothed lock washer.
• Be sure to align the projection on the toothed
lock washer that is between the alignment
marks "b" with the alignment mark "c" on the re-
tainer.
b
c
e
d
5-82
TRANSMISSION
A
2
1
a
B
2
1
a
A. Main axle
B. Drive axle
EAS26350
INSTALLING THE TRANSMISSION
1. Install:
• Bearing "1"
TIP
Face the seal side of bearing to the outside.
2. Install:
• Main axle assembly "1"
• Bearing housing "2"
Bearing housing bolt
12 Nm (1.2 m·kgf, 8.7 ft·lbf)
LOCTITE®
c
1
b
2
b
c
1
b
2
b
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fz09ec 2014

Table of Contents