4.4 Hydraulic connections
4.4.1
Regulations
Installation must be carried out in accordance with the prevailing
regulations, the codes of practice and the recommendations in these
instructions.
Installing the boiler in new installations
(installations less than 6 months old)
- Clean the installation with a universal cleaner to eliminate debris
from the appliance (copper, flaxen thread, flux).
4.4.2
Hydraulic connection of the heating circuit
4.4.3
Hydraulic connection of the water circuit for domestic use
Domestic hot water calorifier instructions
4.4.4
Water treatment
Central heating systems must be cleaned to eliminate
debris (copper, strands, brazing flux) linked to the
installation of the system and deposits that can cause
malfunctions (noise in the system, chemical reaction
between metals). On the other hand, it is important to
protect central heating systems against corrosion, scaling
and microbiological growth by using a corrosion inhibitor
adapted to all types of systems (steel, cast iron radiators,
heated floor, PER)
16
- Thoroughly flush the installation until the water runs clear and
shows no impurities.
Installing the boiler in existing installations
- Remove sludge from the installation.
- Flush the installation.
- Clean the installation with a universal cleaner to eliminate debris
from the appliance (copper, flaxen thread, flux).
- Thoroughly flush the installation until the water runs clear and
shows no impurities.
H
Heating outlet R1 1/2
I
Heating return R1 1/2
K
Draining Rp 3/4
L
Auxiliary outlet or connection of the safety valve Rp1
(1)
Welded connection possible after sawing off the threading.
Install a sludge decanting pot on the return pipe, very close to the
boiler.
GAS 360 S
(1)
(1)
04/01/11 - 300005180-001-C