Huawei Quidway S7700 Configuration Manual - Ethernet page 476

Smart routing switch
Hide thumbs Also See for Quidway S7700:
Table of Contents

Advertisement

Quidway S7700 Smart Routing Switch
Configuration Guide - Ethernet
Networking Requirements
SwitchA, SwitchB, SwitchC, and SwitchD run MSTP. In this example, MSTP runs on Layer 2
interfaces of the Switches.
Figure 9-9 Networking diagram of basic MSTP configurations
SwitchA
SwitchC
Configuration Roadmap
The configuration roadmap is as follows:
1.
2.
3.
4.
5.
6.
7.
Data Preparation
To complete the configuration, you need the following data:
l
l
l
l
Procedure
Step 1 Configure SwitchA.
Issue 01 (2011-07-15)
GE1/0/2
GE1/0/1
GE2/0/1
GE1/0/2
GE1/0/1
Add SwitchA and SwitchC to MST region RG1, and create MSTI1.
Add SwitchB and SwitchD to MST region RG2, and create MSTI1.
Configure SwitchA as the CIST root.
In RG1, configure SwitchA as the CIST regional root and regional root of MSTI1.
Configure the root protection function on GE 1/0/2 and the GE 1/0/1 on SwitchA.
In RG2, configure SwitchB as the CIST regional root and SwitchD as the regional root of
MSTI1.
On SwitchC and SwitchD, connect GE 1/0/1 to a PC and configure GE 1/0/1 as an edge
port. Enable BPDU protection on SwitchC and SwitchD.
Configure the Switches to calculate the path cost by using the algorithm of Huawei.
Region that SwitchA and SwitchC belong to: RG1
Region that SwitchB and SwitchD belong to: RG2
Numbers of the GE interfaces, as shown in
VLAN IDs: 1-20
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
SwitchB
GE1/0/2
GE1/0/1
GE2/0/1
SwitchD
GE1/0/2
GE1/0/1
Figure 9-9
9 MSTP Configuration
459

Advertisement

Table of Contents
loading

This manual is also suitable for:

Quidway s9300

Table of Contents