• SP5-810-002 [SC Reset: Hard High Temp. Detection]
Clears the fusing hardware SC.
• SP3-701-116 [Manual New Unit Set: #Fusing Belt].
Sets the new unit detection flag ON/OFF.
Pressure Roller
Adjustment before replacing the pressure roller
Before replacing the Pressure Roller, set SP3-701-118 to "1" and switch the power OFF. Then replace
the Pressure Roller and switch the power ON.
SP3-701 (Manual New Unit Set)
This SP is the new unit detection flag.
0: new unit detection flag OFF, 1: new unit detection flag ON
Item
Pressure Roller
Replacement
• Do not remove or adjust the pressure adjusting screws [A] when replacing the pressure roller.
• The fusing unit is adjusted in the factory to match the hardness of the pressure roller, so that the nip
width will be correct.
SP
SP3-701-118
Fusing Unit
635