Using A Solar Powered Operator
NOTE
For extended battery backup installation instructions, refer to
Backup
Kit.
6. Slide the plastic cover off the control box and attach the red spade connector to the battery terminal on the
upper DC power switch.
7. Turn both DC power switches ON and program the Smart DC Controller. See
Setup
Menu.
Control Box
DC Battery & Motor
switch (OFF)
DC Solar Panel
switch (OFF)
Input & ground wires
2-8
Red spade
connector
SlideSmart DC Installation and Reference Manual
Installing the Extended Battery
Figure 2-5.
Programming the Initial
Revision D