LTR
D
ADDED SHEET 9 - POST MOUNTED IDLERS LOWERED.
3.25
2.50
Chain to Gate
5.50
2.66
10.50
Optional 50Ah
Batteries
*Note - reduced space
when optional batteries are used.
Stub Conduits 2" above
Pad.
DOCUMENT TITLE
SLIDESMART INSTALLATION
Hy
Security
Kent, Washington
A-4
DESCRIPTION
SLIDESMART DC: BASE RISER MOUNTED
Gate
12.5
6x8.5
Conduit
Area
10.38
18.0
NOTE: DRAWING IS NOT TO SCALE.
SPECIFICATION
SlideSmart DC Installation and Reference Manual
Chain
If no batteries In Base Riser -
Conduit Area is 8.5"x12"
17.5
4X 1/2" x 3 1/2"
Concrete Anchors
7.75
20.3
12.5
DRAWN
DATE
JEF
CHECKED
DATE
APPROVED
DATE
JEF
DATE
2/7/2012
3.25
2.50
CHAIN TO GATE
DOCUMENT NUMBER:
D0335
THIRD ANGLE PROJECTION
APPRV'D
RAW
.72
REV
D
SHT
OF
3
9
Revision D