Performing Network Related Operations; Performing An Mail Transmission Test; Starting And Stopping Mail Transmission - YOKOGAWA GX20 User Manual

Smartdac plus paperless recorder
Hide thumbs Also See for GX20:
Table of Contents

Advertisement

2.7
Performing Network Related Operations
2.7.1

Performing an Mail Transmission Test

Procedure
2.7.2

Starting and Stopping Mail Transmission

Procedure
IM 04L51B01-01EN
This section explains how to perform network related operations.
You can send a test mail to check whether you have configured the mail settings correctly.
1
Press MENU.
The menu screen appears.
2
Tap the Universal tab and then E-Mail test.
The mail transmission test screen appears.
3
Tap Recipient 1 or Recipient 2.
A test mail is sent.
Operation complete
You can enable or disable the mail transmission function.
Starting Mail Transmission
1
Press MENU.
The menu screen appears.
2
Tap the Universal tab and then E-Mail start.
Mail transmission function is enabled.
Operation complete
Stopping Mail Transmission
1
Press MENU.
The menu screen appears.
2
Tap the Universal tab and then E-Mail stop.
Mail transmission function is disabled. Unsent mails are cleared.
Operation complete
Mail Retransmission
If mail transmission fails, the message is retransmitted up to twice at 30-second and
1-minute intervals.
If retransmission fails, the message is discarded.
1
2
3
4
5
App
Index
2-77

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gx10Gp10Gp20

Table of Contents