Built-in overcurrent feature (non-directional)

Procedure
1.
Go to Main menu/Test/Function test modes/Multipurpose protection/
GeneralCurrentVoltage(GAPC)/CVGAPC:x and make sure that CVGAPC to
be tested is unblocked and other functions that might disturb the evaluation of the
test are blocked.
2.
Connect the test set for injection of three-phase currents to the appropriate current
terminals of the IED.
3.
Inject current(s) in a way that relevant measured current (according to setting
parameter CurrentInput) is created from the test set. Increase the current(s) until
the low set stage trips and check against the set trip value.
4.
Decrease the current slowly and check the reset value.
5.
Block high set stage if the injection current will activate the high set stage when
testing the low set stage according to below.
6.
Connect a TRIP output contact to the timer.
7.
Set the current to 200% of the trip value of low set stage, switch on the current
and check the time delay.
For inverse time curves, check the trip time at a current equal to 110% of the trip
current at t_MinTripDelay.
8.
Check that TRIP and PICKUP contacts trip according to the configuration logic.
9.
Release the blocking of the high set stage and check the trip and reset value and
the time delay for the high set stage in the same way as for the low set stage.
10. Finally check that PICKUP and TRIP information is stored in the event menu.
Information on how to use the event menu is found in the
operator's manual.

Overcurrent feature with current restraint

The current restraining value has also to be measured or calculated and the influence
on the operation has to be calculated when the testing of the trip value is done.
Procedure
1.
Trip value measurement
Generator protection REG670 2.2 ANSI and Injection equipment REX060, REX061, REX062
1MRK 502 073-UUS A
SEMOD56488-9 v5
SEMOD56488-35 v3
Commissioning manual

Advertisement

Table of Contents
loading

Table of Contents