Page 22
Power supply wiring
WARNING
Potential property damage or electrical shock! Adhere to ground network
requirements for the facility.
WARNING
After power supply wiring has been installed, make sure the field wiring box cover is
in place and the screw is tightened with a screwdriver to ensure that the cover is
properly bonded to protective earth.
Table 2-6
Table 2-6
Description
Voltage input
Frequency
Power
Operator Manual
4-20 mA output wiring
connector
Digital input wiring
connector
Serial communications
wiring connectors
(see
page
25)
Figure 2-10 PAT700 power supply and I/O wiring terminals
lists specifications for the power supply.
Power supply specifications
Installation – PAT700 Total Organic Carbon Analyzer
Power supply wiring
connectors
Digital output wiring
connectors
Specification
100 to 230 VAC universal
50 to 60 Hz
65 W maximum, fused at 1.25 A
Anatel