4
GENERAL OPERATION
4.1 Overview of Operation
Operation of equipment
4.2 Description of Operation
4.2.1 Warming-up
(1) Initialization
•
Power ON
•
IH coil ON
•
Set number "1" reproduction ratio "100%" and "WAIT WARMING UP" are displayed
•
Fan motors ON
•
Initialization of scanning system
– The carriage moves to the home position.
– The carriage moves to the peak detection position.
– The exposure lamp is turned ON.
– Peak detection (white color is detected by the shading correction plate)
– The exposure lamp is turned OFF.
•
"READY (WARMING UP)" is displayed
(2) Pre-running operation
The pre-running operation is started when the temperature of the fuser roller surface reaches a
certain temperature.
•
Fuser roller rotated
•
Drum rotated
– The main motor is turned ON.
•
Initialization of feeding system
– Each drawer tray goes up.
•
Pre-running operation stops after five seconds.
(3) When the surface temperature of the fuser roller becomes sufficient for fusing,
•
"READY" is displayed.
November 2003 © TOSHIBA TEC
Operation during initializing, pre-running and ready
Copying operation
4 - 1
Drawer feed copying by [START] button
Bypass feed copying
Interrupt copying
e-STUDIO350/450 GENERAL OPERATION
4