Daewoo KORANDO Service Manual page 426

Table of Contents

Advertisement

8. Turn over the cylinder head.
9. Remove the tensioning head (4) and valve seat ring (2)
with drift (14mm) and removal tool.
10. Clean the basic bore of valve seat ring.
11. Measure the basic bore diameter (D2) and outer diameter
(D) of the new valve seat ring (standard size).
12. Calculate the overlap value 'U' (D - D2).
Overlap value 'U'
Example) Measured value D = 37.100mm
Measured value D2 = 37.010mm
Overlap value 'U'
If overlap value 'U' is out of standard, machine
the basic bore for the valve seat ring.
13. Clamp the cylinder head with clamping device.
14. Machining basic bore for valve seat ring (repair size).
Notice
Maintain minimum value of 'B'.
- Machine the basic bore.
Limit
Max. D2
Exhaust
Min. B
- Measure machined basic bore and outer diameter 'D'
of valve seat ring (repair size).
- Measure the overlap 'U'
Overlap 'U' (D - D2)
Example)
Measured value D = 37.600 mm
Measured value D2 = 37.480 mm
Overlap
The basic diameter D2 must be machined by
0.020mm in order to get the required overlap
value.
0.068 - 0.100mm
=
0.090mm
Intake
40.516mm
37.516mm
133.4mm
0.068 - 0.100 mm
U = 0.120 mm
OM600 ENGINE MECHANICAL 1B3-125

Advertisement

Table of Contents
loading

Table of Contents