Juniper J-series Services Router J4350 Getting Started Manual page 222

Juniper networks services router getting started guide
Hide thumbs Also See for J-series Services Router J4350:
Table of Contents

Advertisement

J2320, J2350, J4350, and J6350 Services Router Getting Started Guide
Installing a J2320 or J2350 Crypto Accelerator Module
To install a Crypto Accelerator Module:
1.
2.
3.
4.
Figure 97: Installing a J2320 or J2350 Crypto Accelerator Module
5.
6.
7.
200
Replacing Crypto Accelerator Modules on J2320 and J2350 Routers
Take the following steps if you have not already done so:
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist
a.
and connect the strap to the ESD point on the chassis, or to an outside ESD
point if the router is disconnected from earth ground. For more information
about ESD, see "Preventing Electrostatic Discharge Damage" on page 251.
Press and release the power button to power off the Services Router. Wait
b.
for the
LED to turn off.
POWER
Unplug the power cord or cable from the power source receptacle.
c.
Remove the chassis cover. (See "Removing and Replacing the Chassis Cover
d.
on J2320 and J2350 Routers" on page 176.)
Locate the Crypto Module connector on the system board (see
Figure 97 on page 200).
Remove the Crypto Module from its electrostatic bag.
Align the notches in the Crypto Module with the notches in the connector on the
system board and push the Crypto Module down flat, as shown in
Figure 97 on page 200.
Insert the three screws and tighten them until snug. Do not overtighten.
Replace the chassis cover. (See "Removing and Replacing the Chassis Cover on
J2320 and J2350 Routers" on page 176.)
Replace the power cord or cable.

Advertisement

Table of Contents
loading

This manual is also suitable for:

J6350J2350J2320

Table of Contents