Service Manual
Checklist C Procedures
C-5
Grease the Platform Overload
Mechanism (if equipped)
Genie specifications require that this procedure be
performed every 500 hours or six months,
whichever comes first.
Perform this procedure more often if dusty
conditions exist.
Application of lubrication to the platform overload
mechanism is essential to safe machine operation.
Continued use of an improperly greased platform
overload mechanism could result in the system not
sensing an overloaded platform condition and will
result in component damage.
1
Locate the grease fittings on each pivot pin of
the platform overload assembly.
2
Thoroughly pump grease into each grease
fitting.
Grease Specification
Chevron Ultra-duty grease, EP NLGI 1 (lithium based)
or equivalent
56
ZX-135/70
August 2014
Part No. 218700