Grease The Platform Overload Mechanism (If Equipped) - Genie Z Series Maintenance Manual

Hide thumbs Also See for Z Series:
Table of Contents

Advertisement

Maintenance Manual
Annual Maintenance Procedures
11 Raise the primary boom 3 ft / 1 m.
Result: The primary boom should raise.
12 Remove the key from the bypass/recovery key
switch and insert the key into the main key
switch.
13 Turn the main key switch to the off position.
14 Remove the key from the main key switch and
insert the key into the bypass/recovery key
switch.
15 Turn and hold the bypass/recovery key switch
to the recovery position. The switch must be
held in the recovery position.
Result: The primary boom lowers to the
stowed position.
16 Turn the bypass/recovery key switch to the run
position.
17 Remove the key from the bypass/recovery key
switch and insert the key into the main key
switch.
Close the turntable side cover.
108
A-7
Grease the Platform Overload
Mechanism (if equipped)
Genie specifications require that this procedure be
performed annually.
Perform this procedure more often if dusty
conditions exist.
Application of lubrication to the platform overload
mechanism is essential to safe machine operation.
Continued use of an improperly greased platform
overload mechanism could result in the system not
sensing an overloaded platform condition and will
result in component damage.
This maintenance procedure does not apply to the
following models: S-80 XC, S-85 XC, SX-125 XC,
SX-135 XC, Z-45 XC.
1
Locate the grease fittings on each pivot pin of
the platform overload assembly.
2
Thoroughly pump grease into each grease
fitting.
Grease Specification
Chevron Ultra-duty grease, EP NLGI 1 (lithium based)
or equivalent
S
®
Booms • Z
®
Booms
April 2018
Part No. 1268489GT