Unpacking And Inspecting The Media Gateways-Mcc1; Correcting Shipping Errors - Avaya S8700 Installation Instructions Manual

Installing an avaya s8700 media server with an avaya g650 media gateway
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

Unpacking and inspecting the media
gateways—MCC1
!
1
Check the status of the SHOCKWATCH and/or TILTWATCH indicators on the container. If the
container has been shaken or tilted beyond specifications, the indicators are red, indicating
potential damage. Report any damage according to local shipping instructions.
!
2
Unpack the media gateway and remove all packing material.
3
Move the media gateway into its proper position.
4
Do not adjust the leveling feet at this time.

Correcting shipping errors

1
Red-tag all defective and over-shipped equipment and return according to the nearest Material
Stocking Location (MSL) instructions.
To contact the Avaya Order Management group in the United States, call 1-800-772-5409. For
international customers, contact your order service agent.
2
Direct all short-shipped reports to the nearest MSL. Contact the appropriate location for specific
instructions.
For streamlined implementation, call 1-800-772-5409.
62
DANGER:
Use lifting precautions. A fully loaded MCC1 Media Gateway weighs as much as 800
pounds (363 kilograms) and may be top heavy. Use caution to avoid injury.
DANGER:
Take care to avoid injury while cutting and removing the 2 metal bands.
Installing the Avaya S8700 Media Server with an Avaya G650 Media Gateway
December 2003

Advertisement

Table of Contents
loading

This manual is also suitable for:

G650

Table of Contents