Connecting optional external alarm cable
Interconnect cabling between port networks
— Direct connect to rack hardware
— Direct connect to each port network (duplex and high/critical)
— Switch-connect to port networks (duplex and high/critical)

Positioning and bolting down for earthquakes

Positioning the media gateway
Each media gateway is normally positioned adjacent to the control hardware in the rack or another media
gateway.
1
If the media gateways are supplied with cable ductwork, space the media gateways on 32-inch
(81.3-centimeter) centers +-1/8 inch (0.3 centimeter). They must be level and must be square with
respect to each other.
2
If the media gateways are supplied with cable slack managers, place the media gateways far
enough from the connection field to lay down the 32-inch (81.3-centimeter) slack managers and
to provide a little extra room for the cables to access the cable slack managers.
3
If earthquake protection is required, see
page 92.
4
If earthquake protection is not required, level the media gateways and adjust and lock the media
gateway stabilizing bolts to keep it from moving.
5
At the bottom of the media gateway, install the hole plugs provided in the holes previously
occupied by the four carriage bolts.
Installing earthquake protection for the media gateway
Use the correct procedure for your installation:
Installing concrete floor mounting
Installing raised computer floor mounting
Installing concrete floor mounting
1
Position the media gateway in the exact position it is to occupy when the installation is complete.
2
Insert a pencil or marker through the holes previously occupied by the carriage bolts (front and
rear) in the bottom of the media gateway and mark the floor directly beneath each hole.
3
Roll the media gateway out of the way and drill four 1/2-inch (1.27-centimeter) diameter holes
about 1.5 inch (3.8 centimeter) deep at the locations marked in Step 2.
4
Insert concrete floor anchors (STARR part number 3425) into the holes.
92
NOTE:
The center stage switch is co-located with a port network (PN) in an MCC1 Media
Gateway. It is not required to be located in port network 1.
Installing the Avaya S8700 Media Server with an Avaya G650 Media Gateway
on page 101
Installing earthquake protection for the media gateway
on page 92
on page 93
on
December 2003

Advertisement

Table of Contents
loading

This manual is also suitable for:

G650

Table of Contents