Installing And Administering The Patch Cord/Jumper - Avaya S8700 Installation Instructions Manual

Installing an avaya s8700 media server with an avaya g650 media gateway
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

Installing and administering the patch
cord/jumper
Before starting the patch cord installation, obtain a copy of the Port Assignment Record forms from the
customer or marketing representative. See
The white label identifying the terminal block row associated with circuits 17 to 24 connects to an
identically labeled terminal block row at the satellite closet. See
information outlet,
The satellite symbol must be installed at all connection points between the blue field and the information
outlet. It must also be installed at the information outlet itself.
Figure 69, Example 4-pair labeling to information outlet,
for 4-pair circuits from the equipment room to the information outlets. The labeling scheme for 3-pair
circuits from the MDF to a satellite location.
174
on page 175. This is always the case for either 1-point or 2-point administration.
Installing the Avaya S8700 Media Server with an Avaya G650 Media Gateway
Port Assignment Record Form
Figure 68, Example 3-pair labeling to
on page 176 shows an example labeling scheme
on page 167.
December 2003

Advertisement

Table of Contents
loading

This manual is also suitable for:

G650

Table of Contents