Avaya S8700 Installation Instructions Manual page 132

Installing an avaya s8700 media server with an avaya g650 media gateway
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

Figure 41: Typical RMC patch panel installation
Figure notes
1
Circuit pack amphenol connectors
and B25A cables
2
IP Server Interface adapter and
green CAT5 cable
132
1
3
3
cadlpat LJK 022502
Installing the Avaya S8700 Media Server with an Avaya G650 Media Gateway
2
4
3
24 port patch panels
4
8 port patch panel
5
To network
5
December 2003

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G650

Table of Contents