Installing Post-Upgrade Patch Files - Avaya S8500 Series Job Aids For Field Replacements

Hide thumbs Also See for S8500 Series:
Table of Contents

Advertisement

5. Select <OK> and press Enter to partition the hard drive and reformat the partitions.
The program begins the installation process and reports the progress.
These processes can take up to 20 minutes. When the server is ready to reboot, the
CD-ROM drive drawer opens. You can remove the CD from the drive at this time.
The reboot might take up to 3 minutes.

Installing post-upgrade patch files

Note:
Skip this procedure if there is no Communication Manager software service pack
Note:
file to install.
This software service pack might or might not be call preserving.
Use the browser to load the necessary service packs.
1. Open a browser on your laptop.
2. In the Address field, type http://avaya.support.com and press Enter.
3. Under the Technical Database listing (on the left side), click Communications Systems.
4. Under Communications Systems, scroll down and click S8500 server.
Expanded Procedures
03-300529 Issue 4 January 2008
93

Advertisement

Table of Contents
loading

This manual is also suitable for:

S8500bS8500c

Table of Contents