Fujitsu PRIMERGY RX2540 M7 Upgrade And Maintenance Manual page 511

Table of Contents

Advertisement

Tools:
Replacing the system board:
– Phillips PH2 / (+) No. 2 screw driver
– Torx 30 screw driver
– Magnifying glass for inspecting CPU socket springs
(recommended)
Replacing the TPM:
– Bit screw driver
– flat nose pliers
– TPM bit insert
– thin slotted screw driver (2 x 0.4 mm)
(*)
For Japan:
– Dedicated TPM screw driver (CWZ8291A)
– TPM module fixing tool (S26361-F3552-L909)
Note on BIOS or iRMC S6 firmware restore feature
BIOS or iRMC S6 firmware restore feature is executed at the same time
as the power cord is connected after the system board replacement.
Depending on the configuration of your server the firmware restore
requires different time, see
duration during firmware restore" on page
18 - 38 minutes (systems with PFR feature).
Do not perform the following operations after connecting the power cord.
Please wait for the above time to elapse.
– Remove and reinsert the power cord
– Power button on/off
– Connecting and disconnecting other cables, etc.
For more information, see
RX2540 M7
(*)
"States of power-on indicator and time
"Concluding steps" on page
Upgrade and Maintenance Manual
System board and components
(*)
541:
519.
511

Advertisement

Table of Contents
loading

Table of Contents