Conformance To Ec Directives - Omron SYSMAC CS1W-CLK13 Operation Manual

Optical ring controller link units, h-pcf/gi cable
Table of Contents

Advertisement

Conformance to EC Directives

6
Conformance to EC Directives
1,2,3...
xxii
operation, and always test the settings in trial operation before starting or
stopping the data links in actual operation.
• CPU Bus Units will be automatically restarted when routing tables are
transferred from a Programming Device to the CPU Unit. Resetting is
required to use the new tables. Confirm that restarting the CPU Bus Units
will not adversely affect system operation before transferring routing
tables.
• Observe the following precautions when wiring the communications cable
or backup power supply cables.
• Separate the cables from the power lines or high-tension lines.
• Do not bend the cables.
• Do not pull on the cables.
• Do not place heavy objects on top of the cables.
• Route cables inside conduits.
• Before touching the Unit, be sure to first touch a grounded metallic object
in order to discharge any static build-up.
The Controller Link Units conform to EMC Directives as follows:
EMC Directives
OMRON devices that comply with EC Directives also conform to the related
EMC standards so that they can be more easily built into other devices or the
overall machine. The actual products have been checked for conformity to
EMC standards (see the following note). Whether the products conform to the
standards in the system used by the customer, however, must be checked by
the customer.
EMC-related performance of the OMRON devices that comply with EC Direc-
tives will vary depending on the configuration, wiring, and other conditions of
the equipment or control panel on which the OMRON devices are installed.
The customer must, therefore, perform the final check to confirm that devices
and the overall machine conform to EMC standards.
Note Applicable EMC (Electro-Magnetic Compatibility) standards are as follows:
EMS (Electro-Magnetic Susceptibility): EN61131-2 for CVM1 and CV Series
EMI (Electro-Magnetic Interference):
The Controller Link Units that comply with EC Directives (CVM1-CLK12,
CVM1-CLK52, CS1W-CLK11, CS1W-CLK13, CS1W-CLK12-V1, CS1W-
CLK53, and CS1W-CLK52-V1) must be installed as follows:
1. The Controller Link Units are designed for installation inside control pan-
els. All Controller Link Units must be installed within control panels. Use
the following or equivalent control panels: CVM1-CLK12/52: SA20-614 by
NITTO Electric Words, Ltd., CS1W-CLK11/13/12-V1/53/52-V1: SA20-712
by NITTO Electric Words, Ltd.
2. Use reinforced insulation or double insulation for the DC power supplies
used for the communications power supply and I/O power supplies.
3. The Controller Link Units that comply with EC Directives also conform to
the Common Emission Standard (EN61000-6-4). Radiated emission char-
acteristics (10-m regulations) may vary depending on the configuration of
EN61000-6-2 for CS Series
EN61000-6-4
(Radiated emission: 10-m regulations)
6

Advertisement

Table of Contents
loading

Table of Contents